E-ELT Optical Multi Object Spectrograph
Links
EVE internal website: http://gepinext.obspm.fr/eve/

OPTIMOS BSCW at ESO:
https://groupware.eso.org/bscw/bscw.cgi/0/597569

ESO E-ELT Instrumentation:
http://www.eso.org/sci/facilities/eelt/instrumentation/index.html

ESO E-ELT Instrumentation restricted:
http://www.eso.org/sci/facilities/eelt/instrumentation/restricted/

ESO E-ELT Instrumentation internal:
http://www.eso.org/sci/facilities/eelt/internal/index.html



The following applicable documents form a part of the present document to the extent specified herein. In the event of conflict between applicable documents and the content of the present document, the content of the applicable document shall be taken as superseding.
AD1           E-ESO-SPE-313-0066 Issue 3, Common definitions and acronyms
AD2           E-TRE-ESO-586-0252 V1.0 E-ELT Interfaces for scientific instruments
AD3           E-SOW-ESO-531-0263 V2.0 SOW for OPTIMOS, a VIS-NIR MOS for the E-ELT
AD4           E-SPE-ESO-531-0262 V2.0 Requirements for OPTIMOS, a VIS-NIR MOS for E-ELT
AD5           E-PLA-ESO-531-0268 V0.85 OPTIMOS Study Management and Development Plan
AD6           E-MOU-EVE-531-1002 V1 OPTIMOS - EVE Consortium Memorandum of Understanding
AD7           E-PLA-EVE-531-1001 V1 OP-E01 EVE Study Management and Development Plan
AD8            ‘Executive Summary’ document for the E-ELT instrument and pre-focal adaptive optics module studies, prepared by S. Ramsay, 27-05-2009
In this section the documents are listed that have been produced as part of the OPTIMOS-EVE phase A study. Together with this Executive Summary, these documents form the OPTIMOS-EVE Phase A final review document set and these documents are frequently referenced in this Executive Summary. Note that RD1 is a general document and not part of the OPTIMOS-EVE Phase A final review document set.
In the event of conflict between reference documents and the content of the present document, the content of this document shall be taken as superseding.
RD1           Science Case and Requirements for the ESO ELT – Report of the ELT Science Working Group, dated September 27, 2007
RD2           E-TRE-EVE-509-1002 V2 OPTIMOS-EVE Science Case
RD3           E-SPE-EVE-509-1003 V2 OPTIMOS-EVE Top-level requirements
RD4           E-TRE-EVE-509-1004 V2 OPTIMOS-EVE Operational Concepts Definition
RD5           E-TRE-EVE-509-1007 V2 OPTIMOS-EVE Systems Design and Analysis
RD6           E-TRE-EVE-509-1008 V2 OPTIMOS-EVE ICD
RD7           E-CRE-EVE-509-1015 V1 Change Request for ADC in E-ELT Intermediate Focus
RD8           E-TRE-EVE-509-1009 V2 OPTIMOS-EVE Opto-mechanical design and analysis
RD9           E-TRE-EVE-509-1010 V2 OPTIMOS-EVE Data Reduction Pipeline Architecture
RD10        E-TRE-RAL-509-1025 V2 Detector System Design for OPTIMOS
RD11        E-TRE-OAT-509-1026 V2 Control Software Architecture for OPTIMOS
RD12        E-TRE-RAL-509-1027 V2 The Electronic System Design for OPTIMOS
RD13        E-TRE-EVE-509-1011 V2 OPTIMOS-EVE Scientific Analysis Report
RD14        E-PLA-EVE-509-1012 V1 OPTIMOS-EVE Instrument Management and Development Plan
RD15        Answers to Questionnaire on the interface to the telescope (E-TRE-ESO-586-0013)
HomeLinksContactPhotosAnimation & Papers